KCB provided full HVAC design for the addition of two DOAS systems along with duct systems and vertical, fire-rated, chase construction. KCB provided and installed these systems as well as a new guest room control EMS, constant exhaust register renovation, new domestic water booster pump and new electronic TMV. At the conclusion of the project, the factory sent out a certified technician to start up the units and verify operation. KCB verified that proper installation and operation standards were adhered to at the completion of the project. This project was completed in 2024.