Full-Service Resort Hotel, Scottsdale AZ – Boiler Chiller
KCB was hired to manage the upgrade for the 840-ton chiller as well as the domestic heating and hydronic boiler plant. KCB provided a rental chiller for the property to provide it with cooling and ensure the property could continue operating at normal capacity. All pumps were upgraded to include VFDs to help with the efficiency of the system. The domestic water system was also upgraded. Two new instant water heaters were installed, which allowed for the large water storage tanks to be removed. At the conclusion of the project, the factory sent out a certified technician to start up the units and verify operation. KCB verified that proper installation and operation standards were adhered to at the completion of the project. This project was completed in 2024.