Multi-Unit, Multi-Building Vacation Club Property, Peoria AZ – HVAC System and Controls
KCB provided all initial design work for 220 units across two phases at this multi-unit, multi-building property. Phase one consisted of a strictly mechanical renovation with each of the 88 units receiving updated HVAC system and controls. KCB also managed phase two in coordination with a PIP renovation, managing phased installation across approximately 100 days coordinating with full construction. Each unit received an updated HVAC system and controls. At the conclusion of the project, the factory sent out a certified technician to start up the units and verify operation. KCB verified that proper installation and operation standards were adhered to at the completion of the project.